Open Path Eddy Covariance System With IRGASON or EC150/CSAT3A Quick Deploy Guide March 2014
8.Turn on the power supply and use the datalogger keyboard display to set settings. (Follow the stepsfrom left to right, top to bottom).SystemContr
Modify Value NUM Sonic Azmth Current Value: 0.00000 New Value: 150 Enter in the azimuth (the angle in degre
Please visit www.campbellsci.com to obtain contact information for your local US or International representative.
1. Setup tripod and mount enclosures. DataloggerEnclosureEC100Electronics
2. Ground tripod and enclosures. GroundLugGroundingRod
3. Setup tripod or mast with CM20X Crossarm. Crossarm‐To‐PoleBracketCM20XCrossarm
4. Mount the IRGASON or EC150/CSAT3A and point into the prevailing wind. IRGASONCM20XCrossarmIRGASONBoomAdapterIRGASONMountingBra
5. Mount the radiation shield and IRGASON or EC150/CSAT3A Temperature Probe.CM20XCrossarmRadiationShieldIRGASONorEC150/CSAT3ATemp
6. Connect gas analyzer, sonic anemometer, and temperature probe cables to EC100 Electronics. TemperatureProbeCableGasA
7. Connect system wiring and insert CompactFlash (CF) card.DataloggerEnclosureEC100PowerandSDMCablesInsertCFcard
SDMCableOtherwiseconnectcablefrom+12VdcpowersupplyherePowerCablePowerCable(canconnecthereordirectlyto+12 Vdcpowersupply)SDM
Komentarze do niniejszej Instrukcji