Campbell-scientific CPEC200 Closed-Path Eddy-Covariance System Instrukcja Użytkownika Strona 108

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 112
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 107
Appendix H. CPEC200 Pump Replacement
FIGURE H-6. Self-tapping screws attaching pump to metal box
8. Cut the blue (inlet) and red (outlet) tubing on each side of the pump
behind the barbed connector as shown in FIGURE H-7.
FIGURE H-7. Location of cuts to remove pump assembly from tubing
9. Remove the pump from the assembly.
H.3 Installation
To reinstall a CPEC200 pump, carry out the following steps:
1. Position the pump with the label up and connect the coiled tubing on
both sides of the pump (see FIGURE H-8). Blue tubing connects the
inlets and red connects the outlets as directional arrows show on the
side of the pump (FIGURE H-9).
H-4
Przeglądanie stron 107
1 2 ... 103 104 105 106 107 108 109 110 111 112

Komentarze do niniejszej Instrukcji

Brak uwag