
Installing EnviroSCAN, EnviroSMART & Diviner 2000 access tubes
© Sentek Pty Ltd Page 37
Additional items for difficult stony soils
Item Part Number
Open Centre Tungsten Tip Auger 61.0 mm
70045
Rock Breaker 54.0 mm
70025
Auger extension rods re-enforced 1.0 m
70015
Miscellaneous Items (Installer to supply)
Length of rope – to tie branches or vines temporarily out of the way so that they do not get damaged or
interfere with the augering process.
Duck boards – to prevent soil campaction around the access tube during the installation process.
Measuring tape – to measure to the required depth
Marking pen
2 x 10 litre (2 gallon) buckets – to collect the augered soil and remove it from the site, and to mix the slurry
in.
Notepad and pencil - to record the depth and texture variation throughout the soil profile and any other site
information.
Paint stirrer with electric drill attachment – for mixing the slurry.
Cordless electric drill – to attach to the paint stirrer for mixing the slurry.
Spatula or broad knife – to chip away excess slurry
Slurry Components
Grey cement
Kaolinite (potters clay as fine powder)
Water
Komentarze do niniejszej Instrukcji