Campbell-scientific CVS4200 / BVS4300 Stationary Samplers Instrukcja Użytkownika Strona 11

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 10
CVS4200 / BVS4300 Stationary Samplers
FIGURE 4-1. Sampler installation
4.2 Attach Intake Hose
1. Connect the intake hose to the sampler’s volume control tube (item 1 in
FIGURE 5-1 or FIGURE 5-2).
a. If using the 26925-L PVC Intake Hose with option -QD, attach the
hose using the quick deploy connector.
b. Otherwise, place the hose in warm water for a few minutes. Slip the
hose over the volume control tube and secure the hose using the
clamp.
2. Route the hose so that it has a near continuous slope from the sampler to
the source liquid. This keeps hose clear and fully drained.
3. Place sinker/strainer in source liquid. The sinker/strainer needs to be
placed at a depth in which it will remain submerged regardless of the flow
velocities.
3
Przeglądanie stron 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 91 92

Komentarze do niniejszej Instrukcji

Brak uwag