Campbell-scientific CPEC200 Quickstart Guide Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Urządzenia pomiarowe Campbell-scientific CPEC200 Quickstart Guide. Campbell Scientific CPEC200 Quickstart Guide User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 16
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
CPEC200
Closed Path
Eddy Covariance System
Quick Deploy Guide
May 2014
Przeglądanie stron 0
1 2 3 4 5 6 ... 15 16

Podsumowanie treści

Strona 1 - CPEC200

CPEC200 Closed Path Eddy Covariance System Quick Deploy Guide May 2014

Strona 2

8. Turn on the +12 Vdc power supply and use the datalogger keyboard display to set settings and initiate zero/span checks. (Follow the steps from

Strona 3 - Grounding Rod

8.3 Select "SONIC_AZIMU." 8.4 Enter the CSAT3A sonic head azimuth.

Strona 4 - CM20X Crossarm

8.5 If the CPEC does not have a valve module, skip to the 8.10. Otherwise, select "Zero/Span Config." 8.6 Select "CO2_SPAN.P

Strona 5

8.7 Set CO2_SPAN_PPM to CO2 tank concentration. 8.8 Select CHECK_ZERO, SET_ZERO, CHECK_SPAN1, SET_SPAN1 in sequence.

Strona 6

8.9 For each value selected on the previous screen, change the setting from "False" to "True" for auto zero/span. 8.10 Pre

Strona 8

Please visit www.campbellsci.com to obtain contact information for your local US or International representative.

Strona 9

1. Setup tripod and mount enclosures. CPEC200 Enclosure EC100 Enclosure Pump Module

Strona 10

2. Ground tripod and enclosures. Ground Lug Grounding Rod

Strona 11

3. Setup tripod or mast with CM20X Crossarm. Crossarm-To-Pole Bracket CM20X Crossarm

Strona 12

4. Mount gas analyzer and sonic anemometer. EC155 Gas Analyzer CM20X Crossarm EC155 Boom Adapter Mounting Platform CSAT

Strona 13

5. Connect EC155 and CSAT3A to EC100 Electronics. EC155 Analyzer Cable EC155 Sample Cell Cable CSAT3A Cable

Strona 14

6. Connect system plumbing. Zero Air Tubing Analyzer Tubing Pump Tubing Pump Module Cable CO2 Span Gas Tubing

Strona 15

7. Connect system wiring and insert compact flash (CF) card. EC100 Power and SDM Cables System Power Cable (ensure +12 Vdc power supply is off)

Strona 16

Power Cable to EC100 EC100 SDM Cable Power Cable to +12Vdc Power Supply (off) SDM Cable to EC100 EC100 Power Cable

Komentarze do niniejszej Instrukcji

Brak uwag